206-591-4015

Roof Overhang Guide (Standards, Drip Edge Installation, & More)

Written by: Titan Roofing

house new roof overhang

This guide focuses on the essentials of roof overhangs and drip edge installations, crucial for enhancing your home’s appearance and protecting it against the elements. 

You’ll learn about material selection, including aluminum and galvanized steel, and the critical role of precise measurements and installation methods in ensuring your home’s durability and aesthetic appeal. 

Understanding Roof Overhangs

Roof overhangs 🏘️, or eaves, are essential architectural features extending beyond a building’s exterior walls, protecting against elements like rain and sun. They prevent water damage and rot by directing water away from the structure and providing shade, reducing heat and energy costs. 

Roof overhangs also contribute to a building’s aesthetics, with various styles like open, closed, and boxed eaves available. The design and size of overhangs should be carefully considered to balance functionality with the building’s overall appearance​​​​​​.

Drip Edge Installation Standards

When installing a drip edge, it’s important to adhere to specific standards and building codes to prevent water damage and ensure the longevity of your roof. Drip edge installation involves placing metal flashing over the roof decking and fascia board, and it’s typically required on all new roofs, especially those with shingles.

Key standards and guidelines for drip edge installation include:

  • Overlapping adjacent pieces: Adjacent drip edge pieces should overlap by at least 2 inches to ensure continuous protection.
  • Positioning and extension: The metal should extend up the roof deck by a minimum of 2 inches and extend beyond the roof sheathing by at least 0.25 inches. This positioning helps direct rainwater into the gutters, keeping it away from the fascia boards.
  • Fastening: Fasten each drip edge piece to the roof deck at maximum intervals of 12 inches.
  • Underlayment positioning: The positioning of the drip edge to the underlayment changes based on its location on the roof. For the eaves section, the underlayment is placed above the drip edge. Conversely, the drip edge is installed over the underlayment on the rake edges.
  • Material choice: Common materials for drip edges include aluminum, galvanized steel, and copper, each offering different levels of durability and resistance to corrosion.

There are different profiles of drip edges, such as Type F (gutter apron), Type C (L style), and Type D (T style). Each has its unique shape and function, with some being more suitable for directing water further from the fascia.

For a successful installation, it’s also essential to have the right tools and materials, including measuring tape, tin snips or aviation shears, a hammer, roofing nails or screws, a caulk gun, and safety equipment.

If you need more clarification about the installation process, it’s advisable to consult professional advice to ensure the integrity of your roof is maintained.

Choosing The Right Materials

When selecting materials for drip edge installation, consider durability and suitability for your climate:

  • Aluminum: Popular for its corrosion resistance and available in various colors, aluminum is a good choice for most climates, but it’s not as strong as steel​​​​.
  • Galvanized Steel: Ideal for windy areas, it’s rust-resistant due to galvanization. Opt for at least 24-gauge steel for enhanced durability​​.
  • Copper: Offers a unique look and robust durability, suitable for those seeking an aesthetic edge. Ensure a minimum thickness of 20 ounces or 0.69 mm​​.
  • Vinyl and Rubber: Cost-effective and lightweight, these materials are less durable than metal options and best for non-roofing applications like above doors and windows​​.

Drip edge profiles include:

  • Type C: The classic “L” shape is generally suitable for most applications.
  • Type D: A “T” shape is recommended for keeping water away from the fascia.
  • Type F: Extended edge, useful for installations over existing shingles or on rake edges​​.

Installation should ensure proper overlap and positioning using suitable fasteners. Always consult professionals or manufacturer’s guidelines, especially for unique roofing materials, and adhere to local building codes for safety and compliance.

Step-By-Step Installation Process

Drip edge installation is an important stage in roofing that requires precision and attention to detail. Here’s a comprehensive guide to ensure a smooth and effective installation:

1) Gather Tools And Materials

Gather all the required materials and tools before starting. This includes drip edge material (enough to cover the entire roof), roofing nails, a hammer, tin snips or aviation snips for cutting, a tape measure, a caulking gun for applying sealant, and safety equipment like gloves and goggles.

2) Preparation 

Prepare your work area by ensuring a safe and stable environment. Clear any debris and ensure all tools and materials are in good condition. Read and understand the manufacturer’s instructions for the drip edge product you are using.

3) Installation Layout Planning 

Identify the starting position and orientation of the drip edge on your roof, considering the roof’s slope and the direction of water runoff. Ensure appropriate overlap and alignment to divert water effectively.

4) Start At The Eaves 

Align the drip edge flush with the edge of the eaves, slightly overhanging to guide water away.

5) Securing Drip Edge

Secure the drip edge using roofing nails or screws, following the manufacturer’s guidelines for spacing the fasteners, typically every 12 to 18 inches.

6) Overlap Sections

For multiple drip edge sections, ensure proper overlap between them, typically two to three inches, to prevent water seepage and provide a continuous barrier.

7) Cut And Shape For Corners

Trim and bend the drip edge for a tight fit around corners, then carefully fold and fasten it at intersections to ensure a strong, leak-proof seal.

8) Check Alignment 

Regularly check that the drip edge aligns straight and parallel with the roof’s edge. This step is needed for both aesthetic uniformity and effective water channeling.

9) Complete Installation

Continue the installation along the entire perimeter of the roof, taking care to fasten each section securely and properly overlap.

10) Final Inspection And Adjustments 

Once installed, inspect the drip edge for any loose or improperly secured sections and make necessary adjustments.

Avoid common installation mistakes such as incorrect measurements and misalignment to ensure a professional and effective finish. 

Common Installation Mistakes

Common installation mistakes for drip edges include inadequate overlap (less than 2 inches), misalignment leading to water penetration, insufficiently securing the drip edge, non-compliance with building codes, and improper use or omission of sealant. 

These errors can lead to water leaks, fascia board rot, and structural damage. To avoid these pitfalls, ensure accurate measurements, strict adherence to building codes, proper alignment and secure fastening, and meticulous sealant application​​​​​​. Consider seeking professional help for optimal results and navigating these complex aspects​​​​​​.

Transparency. Trust. Titan.

Get Started